Latest News LATEST NEWS
High quality tank agitators and thickeners are available through ... more>>

Latest News LATEST NEWS
New installation of our unique BFCF combination system for preven... more>>

Latest News LATEST NEWS
Begg Cousland relocated offices as Glasgow begins to build the 20... more>>

Latest News LATEST NEWS
An exclusive agreement has been made by Begg Cousland & Co. Ltd. ... more>>

Latest News LATEST NEWS
Begg Cousland supplied a major Russian customer in Summer 2005 wi... more>>

Latest News LATEST NEWS
The commissioning of the Caldo hot gas filter at the Slavneft pla... more>>

*
Begg Cousland logo
*
* [Home] [About] [Products] [Markets] [News] [Knowledge] [Contact] [Search Begg Cousland]   *
*
*
[Begg Cousland World Leaders in Pollution Control]



  RELATED TOPICS
  * PRODUCTS
* Coalescers / Knitted Wire / Mesh Pad
Demisters/Knitted Wire/ Mesh Pad
  ----------------------------------
  * INDUSTRY SECTORS
* CHEMICALS PRODUCTION - Nitrogen Fertilisers
  ----------------------------------
  * CASE STUDY
* AMMONIUM NITRATE GRANULATOR DRYER EXIT
An Ammonium Nitrate Granulator Dryer emission of c... more>>
  ----------------------------------
  * DOWNLOADS
* Filters - Dropl..
view
Mist Eliminator..
view
Nitrogen Fertil..
view
  ----------------------------------
*
*
*

*Home | Markets: Applications & Case Studies | Applications: NITROGEN FERTILISERS / UREA PRILLING TOWER DEMISTERS & COALESCERS FOR LOW PRESSURE LOSS FILTRATION AND CONCURRENT NH3 ABSORBTION.

[Markets: Applications ]

NITROGEN FERTILISERS / UREA PRILLING TOWER DEMISTERS & COALESCERS FOR LOW PRESSURE LOSS FILTRATION AND CONCURRENT NH3 ABSORBTION.

PROCESS INFORMATION
2 towers each with exit of 550,000 NM³/hr at 20º C, via 6 roof mounted fans above horseshoe-shaped housing round the top of the tower (area 96m²).Fan size would only allow a *p of 40 mm. WG maximum.Inlet loads said to be 27 mg/m³ of Urea & 27 mg/m³ of NH3 (Note – Actual emissions were higher).This was a Soviet Union plant.

PROBLEMS TO SOLVE
The towers were old and could not take the weight of the numbers of candles needed to operate at such low *p. The towers actually had much higher NH3 exit concentrations than in the west and so scrubbing, as well as filtering, was required.

DESIGN SOLUTION


  • 1ST stage ‘Becoil’ Demister / Coalescer in 304 Stainless Steel or special alloy such as Sandvik 2RK65 , irrigated with 40 to 50% urea solution from above.
  • 2nd stage ‘Becoil’ Demister in 304 Stainless Steel, with demineralised water wash.

We guaranteed:

  • Pressure drop: 40 mm. WG maximum
  • Efficiency : NH3 Overall 5 mg/m³ maximum
  • Efficiency : Urea Overall 5 mg/m³ maximum

Result : Efficiency : Urea Overall 5 mg/m³ maximumThe inlet loads were significantly higher than the design values given, e.g. 140 – 250mg/m3 of NH3, and 80 – 120mg/m3 of Urea. However, best NH3 exit achieved was 30mg/m3 which is still very good in the circumstances.